<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
<channel>
<title>IBM BAW Tips Q&amp;A - Recent questions tagged javascript</title>
<link>https://bpm.tips/tag/javascript</link>
<description>Powered by Question2Answer</description>
<item>
<title>How do I build a maintainable custom coach view: structure, configuration options, content box, events and styling isolation?</title>
<link>https://bpm.tips/3539/how-do-build-maintainable-custom-coach-view-structure-configuration-options-content-box-events-and-styling-isolation</link>
<description>We need controls that the UI Toolkit does not offer (a signature pad, a map, a rich grid). What is the right structure of a custom coach view so that it behaves like the toolkit controls, is reusable, and survives toolkit upgrades?</description>
<guid isPermaLink="true">https://bpm.tips/3539/how-do-build-maintainable-custom-coach-view-structure-configuration-options-content-box-events-and-styling-isolation</guid>
<pubDate>Sun, 06 Sep 2026 13:57:06 +0000</pubDate>
</item>
<item>
<title>Why do dates shift by one day between coaches, scripts and the database in BAW, and how do I handle time zones correctly?</title>
<link>https://bpm.tips/3533/why-do-dates-shift-by-one-day-between-coaches-scripts-and-the-database-in-baw-and-how-do-i-handle-time-zones-correctly</link>
<description>A date entered as 2025-06-30 in a coach shows as 2025-06-29 in a later coach, e-mails or the database, depending on where the user sits. What causes the shift and what is the correct handling of dates and time zones across browser, server and database?</description>
<guid isPermaLink="true">https://bpm.tips/3533/why-do-dates-shift-by-one-day-between-coaches-scripts-and-the-database-in-baw-and-how-do-i-handle-time-zones-correctly</guid>
<pubDate>Sun, 06 Sep 2026 13:56:05 +0000</pubDate>
</item>
<item>
<title>What changes for coach views and client-side scripts when a process app moves to CP4BA?</title>
<link>https://bpm.tips/3409/what-changes-for-coach-views-and-client-side-scripts-when-a-process-app-moves-to-cp4ba</link>
<description>Our coaches use the BPM UI Toolkit plus a few custom coach views with jQuery and direct XMLHttpRequest calls to /rest/bpm/wle/v1. After importing into CP4BA some views break. What is different for browser-side code?</description>
<guid isPermaLink="true">https://bpm.tips/3409/what-changes-for-coach-views-and-client-side-scripts-when-a-process-app-moves-to-cp4ba</guid>
<pubDate>Sun, 06 Sep 2026 13:33:54 +0000</pubDate>
</item>
</channel>
</rss>